What Is Building Information Modelling (BIM)? A Complete Guide

What Is Building Information Modelling (BIM)? A Complete Guide

17 min read

Building information modelling (BIM) is a collaborative process for creating and managing information about a building or infrastructure asset across its whole life cycle, built around a shared digital model that combines 3D geometry with structured data. So the short answer to “what is BIM?” is that BIM stands for building information modelling, and the model is a single, agreed source of project information, not just a 3D drawing. This guide covers what a BIM model contains, how project teams use BIM from design to facility management, the open standards behind it, and how BIM works in Singapore under CORENET X.

On this page
  1. What is building information modelling (BIM)?
  2. What is in a BIM model?
  3. BIM dimensions: 3D, 4D, 5D, 6D and 7D
  4. How BIM works across the project lifecycle
  5. Open BIM standards: IFC, ISO 19650, CDE and COBie
  6. BIM software and tools
  7. BIM in Singapore: BCA, IDD and CORENET X
  8. Benefits of BIM
  9. How to implement BIM on a project
  10. Frequently asked questions
  11. Explore the Beyond+ BIM guides
  12. References

What is building information modelling (BIM)?

NBS defines BIM as “a process for creating and managing information on a construction project throughout its whole life cycle”. As part of that process, the project team develops a coordinated digital description of every aspect of the built asset. That description is usually a mix of information-rich 3D models and associated structured data, such as product, execution and handover information. In Singapore, the Building and Construction Authority (BCA) describes BIM as “a collaborative 3D model-based process to efficiently plan, design, construct and manage buildings and infrastructure through their lifecycle”.

Three points follow from these definitions:

  • BIM is a process, not a product. BIM software creates the building information model. The value comes from how project teams agree to produce, check and share information.
  • The model is a shared information source. Architects, engineers, contractors and building owners each contribute to it and draw on it, so the entire project team makes design decisions from the same relevant information.
  • BIM covers the whole building lifecycle. The same information supports design, the construction phase, handover, building operations and asset management.

BIM vs CAD: what changed

Computer-aided design (CAD) replaced the drawing board with digital 2D drawings. Later 3D modelling tools let teams build a digital model of the building itself. As NBS explains, most of the industry would not treat 2D geometry as BIM. A 3D model of a building, though, lets the team generate 2D drawings and views from one source, produce schedules of the objects in the model, and combine discipline models to find geometric clashes. In CAD, a wall is a set of lines. In a BIM model, it is an object with a type, materials, properties and relationships to the rest of the building.

A short history of BIM

BIM grew out of the move from drawing boards to 2D CAD and then to 3D modelling packages. Open data exchange followed: buildingSMART’s Industry Foundation Classes went through widely used versions such as IFC 2×3 (2005) and IFC4 (2013). In 2011 the UK Government announced that it would require collaborative 3D BIM on its projects by 2016, and it chose COBie for non-graphical data. The international ISO 19650 series grew from the UK’s PAS 1192 standards, and ISO 19650-1 was published in December 2018. In Singapore’s construction industry, BIM now underpins regulatory approval of new building projects through CORENET X.

What is in a BIM model?

A BIM model is a structured collection of BIM objects (sometimes called BIM components), each carrying geometry and information. NBS describes a BIM object as information that defines a product together with geometry that represents its physical characteristics. Typical contents include:

  • Geometry: the shape, size and location of building components such as walls, slabs, ducts, pipes, doors and equipment.
  • Properties: materials, performance data, classification codes, manufacturer and product details, fire ratings and similar attributes.
  • Relationships: which level and space an element sits in, which system it belongs to and what it connects to.
  • Linked project information: specifications, schedules, cost data and handover documents held in or linked to the model.

On larger projects each discipline usually authors its own model. These are combined into a federated model. The CORENET X Code of Practice defines a federated model as one that compiles models from different disciplines or sections into a single model of the project. For Singapore regulatory submissions, models are geo-referenced to the SVY21 coordinate system and the Singapore Height Datum.

LOD and level of information need

Not every element needs full detail at every stage. The BIMForum Level of Development (LOD) Specification helps teams state clearly what a model element contains and how far it can be relied on at each stage of design and construction. It is designed to be used alongside a BIM execution plan, not to replace it. Internationally, ISO 7817-1:2024 sets out the concept of “level of information need”: a consistent way to specify the detail and extent of information that must be exchanged and delivered. In practice, teams often split this into LOD for geometry and level of information (LOI) for data.

BIM dimensions: 3D, 4D, 5D, 6D and 7D

“Dimensions” are a common shorthand for the kinds of information added to a 3D BIM model. Use them with care. NBS notes that 4D (time) and 5D (cost) are widely understood, but there is little international consensus beyond that, and the ISO standards do not normally use these terms. Some sources call facility management 6D and sustainability 7D. Others reverse them. When you write requirements, name the exact information you need instead of using a number.

TermCommonly used to meanTypical useConsensus
3DGeometry with attached informationDesign, drawings, BIM coordination and clash detectionWidely agreed
4D3D model linked to the construction programmeProject scheduling, sequencing, logistics and site planningWidely agreed
5DModel linked to cost informationQuantity take-off and cost planningWidely agreed
6DOften facility management data; some sources use it for sustainabilityHandover, maintenance and facility managementVaries by source
7DOften sustainability or energy data; some sources use it for facility managementEnergy performance, energy consumption and carbon studiesVaries by source

How BIM works across the project lifecycle

The BIM process follows the asset across the entire design and construction process and into operation. NBS describes it like this. Early on, a collaborative team agrees the process and information structures. During construction, the information is used to plan and build more efficiently, and design changes follow an agreed, recorded process. At handover, the modelled information is used to operate the building.

StageHow BIM is usedTypical outputs
Briefing and designSet information requirements; develop discipline models; test options and design decisionsDesign models, drawings, early quantities, analysis
CoordinationFederate architectural, structural and MEP models; run clash detection; resolve issues before siteCoordinated model, clash reports, issue logs
Regulatory submission (Singapore)Prepare IFC+SG models for agency review through CORENET X gatewaysIFC+SG models and supporting documents
ConstructionShop drawings, sequencing (4D), quantities (5D), prefabrication and progress checksShop drawings, 4D simulations, fabrication models
Handover and operationDeliver as-built models and structured asset data for maintenance and facility managementAs-built model, COBie or other asset data, O&M information

Coordination is where many teams first see the value of BIM. Multiple 3D models are combined, and clashes between building components, such as a duct running through a beam, are found and fixed in the model instead of on site, where they cost more time and carry more risk. Beyond+ runs this as a BIM coordination service for contractors and consultants. At the other end of the lifecycle, structured handover data supports asset management and maintenance. That is the job of as-built, 6D BIM and COBie deliverables.

Open BIM standards: IFC, ISO 19650, CDE and COBie

BIM depends on agreed standards, so information can move between organisations, software and project stages without being lost. The four you will meet most often are listed below.

IFC and buildingSMART

Industry Foundation Classes (IFC) is the open data standard behind open BIM. According to buildingSMART International, IFC is “a set of standardized, digital descriptions of the built asset industry”, published as an open standard and as ISO 16739, and it is vendor-neutral. IFC is more than a file format. It is a data schema that defines how objects, properties and relationships are organised, usually exchanged as a .ifc file. The latest official version, IFC 4.3, was published by ISO as ISO 16739-1:2024 and adds support for infrastructure. This interoperability is what lets a model authored in one tool be reviewed in another.

ISO 19650: information management using BIM

ISO 19650-1:2018 sets out the concepts and principles of information management “using building information modelling”. It recommends a framework for exchanging, recording, versioning and organising information for all parties. It applies to the whole life cycle of any built asset, at any scale. ISO lists a revision as under development. ISO 19650-2 covers the delivery phase, including information requirements, the BIM execution plan and the common data environment. The information delivered builds up the project information model, which is archived at project close-out. Beyond+ helps owners and delivery teams put these processes in place through ISO 19650 consultancy.

Common data environment (CDE)

ISO 19650 defines a common data environment as the “agreed source of information for any given project or asset, for collecting, managing and disseminating each information container through a managed process”, as quoted by Autodesk University. In practice, information moves through work in progress, shared, published and archive states. The UK BIM Framework guidance illustrates this flow. A CDE is a managed process supported by software, not just a shared drive, and it is the backbone of a working BIM environment.

COBie for handover data

Construction Operations Building Information Exchange (COBie) is, in NBS’s words, “a non-proprietary data format for the publication of a subset of building information models (BIM) focused on delivering asset data as distinct from geometric information”. It is typically delivered as a spreadsheet, with worksheets for floors, spaces, types, components, contacts and maintenance jobs. It was developed by US public agencies to improve handover to owner-operators.

BIM levels and maturity

You may also see the term “BIM Level 2”. It comes from the UK’s Bew-Richards BIM maturity model. Level 2 described collaborative working with discipline models and COBie for non-graphical data. As NBS notes, the international ISO 19650 series now defines the BIM process and has its roots in the UK’s PAS 1192 standards. Many teams now refer to the standard instead of a level.

BIM software and tools

BIM is not a single piece of software, but BIM tools do the modelling, checking and sharing. Common BIM applications include:

  • Autodesk Revit: design, documentation and coordination for architecture, structure and MEP, with parametric components and worksharing.
  • Graphisoft Archicad: BIM software for architects, with openBIM collaboration workflows.
  • Tekla Structures (Trimble): structural BIM software for detailed, constructible models.
  • Autodesk Navisworks: model review and coordination, with clash detection, 4D and 5D simulation and quantification across many file formats.

Point cloud and photogrammetry tools also feed scan-to-BIM work on existing buildings. For a fuller comparison, including IFC+SG support, see our guide to BIM software in Singapore.

BIM in Singapore: BCA, IDD and CORENET X

Singapore uses BIM both as a productivity tool and as the basis of regulatory approval.

Integrated Digital Delivery (IDD)

BCA describes Integrated Digital Delivery (IDD) as one of the key thrusts of the Built Environment Industry Transformation Map. It uses digital technologies to connect all stakeholders on a project across design, fabrication, construction and asset management. BIM is the information backbone of IDD, and BCA publishes resources on producing quality BIM models.

CORENET X and IFC+SG

CORENET X is Singapore’s one-stop digital platform for regulatory approval of building works. Qualified Persons make coordinated submissions to seven agencies: BCA, URA, LTA, NEA, NParks, PUB and SCDF. Building works follow Pre-Submission Consultation, then the Design Gateway, the Piling Gateway (where applicable), the Construction Gateway and the Completion Gateway. Independent Submissions and a Direct Submission Process for smaller-scale works are also available. BIM models are submitted in IFC+SG format, which combines IFC with Singapore-specific data so agencies can read, review and check the model. Our explainer on what IFC+SG is covers the details.

Key dates, from the joint BCA and URA circular of 23 July 2026 (APPBCA-2026-12 / URA/PB/2026/08-DCG):

  • From 1 October 2025, CORENET X Gateway Processes became mandatory for new projects with GFA of 30,000 m² or more.
  • From 1 October 2026, they are mandatory for all new projects with GFA of 5,000 m² or more, and IFC+SG is mandatory at this size.
  • Projects of 5,000 m² or more that started submissions in CORENET 2.0 by 30 September 2026 may continue there for now.
  • Projects below 5,000 m² are not required to onboard and may continue in CORENET 2.0, where 2D or lightweight BIM is allowed. They may join CORENET X voluntarily.

The CORENET X Code of Practice, now in its fourth edition (launched 22 September 2026), documents submission requirements across agencies. For a practical reading of the threshold, see CORENET X from 1 October 2026.

Benefits of BIM

Results depend on how well BIM is implemented. These benefits are well established:

  • Fewer clashes and less rework: combining discipline models exposes conflicts during the design process, before they reach site.
  • Consistent documentation: drawings, views and schedules come from one model, so a design change flows through to every output.
  • Better communication: stakeholders and building owners can understand a 3D model more easily than a set of 2D drawings.
  • Better planning: 4D sequencing and model-based quantities support project planning, resource management and cost control.
  • Earlier sustainability input: analysis based on the design model can inform energy efficiency decisions while the design can still change.
  • Smoother approvals in Singapore: the BCA–URA circular reports that CORENET X projects achieved time savings of up to two months, fewer resubmissions and better cross-discipline coordination.
  • Better handover: structured asset data supports building management, maintenance and facility management, and can feed a digital twin.

The main challenges in BIM implementation are cultural and procedural rather than technical: unclear information requirements, uneven skills across the supply chain, and models that are not maintained after design. The guides listed below go deeper on each of these topics.

How to implement BIM on a project

Successful integration of BIM depends more on planning than on software. A practical sequence:

  1. Define what information is needed. The appointing party (client) sets out its information requirements: what is needed, when and in what format. This includes any CORENET X and IFC+SG requirements.
  2. Agree a BIM execution plan (BEP). Under ISO 19650-2, a prospective lead appointed party submits a pre-appointment BEP with its tender. The UK BIM Framework guidance explains that the plan is then confirmed and maintained after appointment as a contract document under change control, and recommends keeping it “simple and concise”.
  3. Assign roles. Name who manages information, who runs BIM coordination and who authors each model. The lead appointed party keeps the BEP current as more parties join.
  4. Set up the CDE and standards. Agree naming, classification, the level of information need for each stage, and the review and approval workflow.
  5. Train the team. Train people in the BIM workflows they will actually use, not just software features. The BCA–URA circular notes that the Productivity Solutions Grant can support BIM software and IFC+SG courses.
  6. Start small, then scale. A pilot project or one well-defined use, such as coordination or handover data, builds confidence before wider use of BIM across the business.

Beyond+ supports the transition to BIM through BIM services in Singapore, including Revit modelling, coordination, CORENET X submission support and scan to BIM, as well as corporate BIM training for in-house teams.

Frequently asked questions

What does BIM stand for?

BIM stands for building information modelling (spelt “modeling” in US English). The same acronym is also used for the building information model, which is the digital output of the process.

Is BIM software?

No. BIM is a process for creating and managing information. Software such as Revit, Archicad or Tekla Structures is used to author the digital building model, and tools such as Navisworks are used to review them. Open formats such as IFC let these tools share information.

What is the difference between BIM and CAD?

CAD produces drawings made of lines. BIM produces a model made of objects that carry data. Drawings, schedules and clash checks are then generated from the model, so they stay consistent when the design changes.

Is BIM mandatory in Singapore?

For regulatory submission, CORENET X Gateway Processes with IFC+SG models are mandatory for new projects with GFA of 5,000 m² or more from 1 October 2026. Smaller projects may stay on CORENET 2.0 or join CORENET X voluntarily. Contracts may impose their own BIM requirements on any project.

What are the stages of BIM?

There is no single official list. Most projects follow briefing and design, coordination, regulatory submission, construction, and handover and operation, with information developed at an agreed level at each stage. ISO 19650 organises this as information requirements, delivery and exchange through a CDE.

Is BIM only for large projects?

No. ISO 19650 is written to be adapted to projects of any scale. Smaller projects often benefit most from a few targeted uses, such as coordination or accurate quantities.

Explore the Beyond+ BIM guides

Standards and fundamentals

Process, delivery and compliance

Roles, sectors and partners

References

  1. “What is BIM?”, NBS (Dr Stephen Hamil), 9 September 2021. https://www.thenbs.com/knowledge/what-is-building-information-modelling-bim
  2. “Building Information Modelling (BIM)”, Building and Construction Authority, last updated 17 August 2026. https://www1.bca.gov.sg/safety-and-standards/lifts-escalators-and-mechanised-car-parking-systems/building-information-modelling-bim/
  3. “BIM dimensions – 3D, 4D, 5D, 6D BIM explained”, NBS (Dr Stephen Hamil), 8 September 2021. https://www.thenbs.com/knowledge/bim-dimensions-3d-4d-5d-6d-bim-explained
  4. “What is COBie?”, NBS (Dr Stephen Hamil), 29 October 2018. https://www.thenbs.com/knowledge/what-is-cobie
  5. “Industry Foundation Classes (IFC)”, buildingSMART International. https://www.buildingsmart.org/standards/bsi-standards/industry-foundation-classes/
  6. “ISO 19650-1:2018 – Information management using building information modelling – Part 1: Concepts and principles”, ISO, December 2018. https://www.iso.org/standard/68078.html
  7. “ISO 7817-1:2024 – Building information modelling – Level of information need – Part 1: Concepts and principles”, ISO, June 2024. https://www.iso.org/standard/82914.html
  8. “Level of Development (LOD) Specification”, BIMForum. https://bimforum.org/resource/lod-level-of-development-lod-specification/
  9. “Information management according to BS EN ISO 19650 – Guidance Part 2: Processes for Project Delivery”, UK BIM Framework, third edition, January 2020. https://ukbimframework.org/wp-content/uploads/2020/02/ISO_19650_Guidance_Part_2_Processes_for_Project_Delivery_ThirdEdition.pdf
  10. “ISO 19650, the Common Data Environment, and Autodesk Construction Cloud”, Autodesk University (Joan Allen and Angela Yee). https://www.autodesk.com/autodesk-university/article/ISO-19650-Common-Data-Environment-and-Autodesk-Construction-Cloud
  11. “CORENET X Code of Practice”, CORENET X (Government of Singapore), fourth edition 2026. https://info.corenet.gov.sg/regulatory-process/corenet-x-code-of-practice
  12. “Integrated Digital Delivery (IDD)”, Building and Construction Authority, last updated 16 March 2026. https://www1.bca.gov.sg/growth-and-transformation/productivity/idd-integrated-digital-delivery/
  13. “CORENET X”, CORENET X information website (Government of Singapore). https://info.corenet.gov.sg/
  14. “What is IFC+SG”, CORENET X (Government of Singapore). https://info.corenet.gov.sg/ifc-sg/start-here/WhatIsIFCSG
  15. “Updates to CORENET X Implementation Plan” (BCA APPBCA-2026-12 / URA/PB/2026/08-DCG), Urban Redevelopment Authority and Building and Construction Authority, 23 July 2026. https://www.ura.gov.sg/guidelines/circulars/dc26-08/
  16. “Autodesk Revit”, Autodesk. https://www.autodesk.com/products/revit/overview
  17. “Archicad”, Graphisoft. https://www.graphisoft.com/archicad/
  18. “Tekla Structures – Structural BIM Software”, Trimble Tekla. https://www.tekla.com/products/tekla-structures
  19. “Navisworks”, Autodesk. https://www.autodesk.com/products/navisworks/overview