17 min read
Building information modelling (BIM) is a collaborative process for creating and managing information about a building or infrastructure asset across its whole life cycle, built around a shared digital model that combines 3D geometry with structured data. So the short answer to “what is BIM?” is that BIM stands for building information modelling, and the model is a single, agreed source of project information, not just a 3D drawing. This guide covers what a BIM model contains, how project teams use BIM from design to facility management, the open standards behind it, and how BIM works in Singapore under CORENET X.
NBS defines BIM as “a process for creating and managing information on a construction project throughout its whole life cycle”. As part of that process, the project team develops a coordinated digital description of every aspect of the built asset. That description is usually a mix of information-rich 3D models and associated structured data, such as product, execution and handover information. In Singapore, the Building and Construction Authority (BCA) describes BIM as “a collaborative 3D model-based process to efficiently plan, design, construct and manage buildings and infrastructure through their lifecycle”.
Three points follow from these definitions:
Computer-aided design (CAD) replaced the drawing board with digital 2D drawings. Later 3D modelling tools let teams build a digital model of the building itself. As NBS explains, most of the industry would not treat 2D geometry as BIM. A 3D model of a building, though, lets the team generate 2D drawings and views from one source, produce schedules of the objects in the model, and combine discipline models to find geometric clashes. In CAD, a wall is a set of lines. In a BIM model, it is an object with a type, materials, properties and relationships to the rest of the building.
BIM grew out of the move from drawing boards to 2D CAD and then to 3D modelling packages. Open data exchange followed: buildingSMART’s Industry Foundation Classes went through widely used versions such as IFC 2×3 (2005) and IFC4 (2013). In 2011 the UK Government announced that it would require collaborative 3D BIM on its projects by 2016, and it chose COBie for non-graphical data. The international ISO 19650 series grew from the UK’s PAS 1192 standards, and ISO 19650-1 was published in December 2018. In Singapore’s construction industry, BIM now underpins regulatory approval of new building projects through CORENET X.
A BIM model is a structured collection of BIM objects (sometimes called BIM components), each carrying geometry and information. NBS describes a BIM object as information that defines a product together with geometry that represents its physical characteristics. Typical contents include:
On larger projects each discipline usually authors its own model. These are combined into a federated model. The CORENET X Code of Practice defines a federated model as one that compiles models from different disciplines or sections into a single model of the project. For Singapore regulatory submissions, models are geo-referenced to the SVY21 coordinate system and the Singapore Height Datum.
Not every element needs full detail at every stage. The BIMForum Level of Development (LOD) Specification helps teams state clearly what a model element contains and how far it can be relied on at each stage of design and construction. It is designed to be used alongside a BIM execution plan, not to replace it. Internationally, ISO 7817-1:2024 sets out the concept of “level of information need”: a consistent way to specify the detail and extent of information that must be exchanged and delivered. In practice, teams often split this into LOD for geometry and level of information (LOI) for data.
“Dimensions” are a common shorthand for the kinds of information added to a 3D BIM model. Use them with care. NBS notes that 4D (time) and 5D (cost) are widely understood, but there is little international consensus beyond that, and the ISO standards do not normally use these terms. Some sources call facility management 6D and sustainability 7D. Others reverse them. When you write requirements, name the exact information you need instead of using a number.
| Term | Commonly used to mean | Typical use | Consensus |
|---|---|---|---|
| 3D | Geometry with attached information | Design, drawings, BIM coordination and clash detection | Widely agreed |
| 4D | 3D model linked to the construction programme | Project scheduling, sequencing, logistics and site planning | Widely agreed |
| 5D | Model linked to cost information | Quantity take-off and cost planning | Widely agreed |
| 6D | Often facility management data; some sources use it for sustainability | Handover, maintenance and facility management | Varies by source |
| 7D | Often sustainability or energy data; some sources use it for facility management | Energy performance, energy consumption and carbon studies | Varies by source |
The BIM process follows the asset across the entire design and construction process and into operation. NBS describes it like this. Early on, a collaborative team agrees the process and information structures. During construction, the information is used to plan and build more efficiently, and design changes follow an agreed, recorded process. At handover, the modelled information is used to operate the building.
| Stage | How BIM is used | Typical outputs |
|---|---|---|
| Briefing and design | Set information requirements; develop discipline models; test options and design decisions | Design models, drawings, early quantities, analysis |
| Coordination | Federate architectural, structural and MEP models; run clash detection; resolve issues before site | Coordinated model, clash reports, issue logs |
| Regulatory submission (Singapore) | Prepare IFC+SG models for agency review through CORENET X gateways | IFC+SG models and supporting documents |
| Construction | Shop drawings, sequencing (4D), quantities (5D), prefabrication and progress checks | Shop drawings, 4D simulations, fabrication models |
| Handover and operation | Deliver as-built models and structured asset data for maintenance and facility management | As-built model, COBie or other asset data, O&M information |
Coordination is where many teams first see the value of BIM. Multiple 3D models are combined, and clashes between building components, such as a duct running through a beam, are found and fixed in the model instead of on site, where they cost more time and carry more risk. Beyond+ runs this as a BIM coordination service for contractors and consultants. At the other end of the lifecycle, structured handover data supports asset management and maintenance. That is the job of as-built, 6D BIM and COBie deliverables.
BIM depends on agreed standards, so information can move between organisations, software and project stages without being lost. The four you will meet most often are listed below.
Industry Foundation Classes (IFC) is the open data standard behind open BIM. According to buildingSMART International, IFC is “a set of standardized, digital descriptions of the built asset industry”, published as an open standard and as ISO 16739, and it is vendor-neutral. IFC is more than a file format. It is a data schema that defines how objects, properties and relationships are organised, usually exchanged as a .ifc file. The latest official version, IFC 4.3, was published by ISO as ISO 16739-1:2024 and adds support for infrastructure. This interoperability is what lets a model authored in one tool be reviewed in another.
ISO 19650-1:2018 sets out the concepts and principles of information management “using building information modelling”. It recommends a framework for exchanging, recording, versioning and organising information for all parties. It applies to the whole life cycle of any built asset, at any scale. ISO lists a revision as under development. ISO 19650-2 covers the delivery phase, including information requirements, the BIM execution plan and the common data environment. The information delivered builds up the project information model, which is archived at project close-out. Beyond+ helps owners and delivery teams put these processes in place through ISO 19650 consultancy.
ISO 19650 defines a common data environment as the “agreed source of information for any given project or asset, for collecting, managing and disseminating each information container through a managed process”, as quoted by Autodesk University. In practice, information moves through work in progress, shared, published and archive states. The UK BIM Framework guidance illustrates this flow. A CDE is a managed process supported by software, not just a shared drive, and it is the backbone of a working BIM environment.
Construction Operations Building Information Exchange (COBie) is, in NBS’s words, “a non-proprietary data format for the publication of a subset of building information models (BIM) focused on delivering asset data as distinct from geometric information”. It is typically delivered as a spreadsheet, with worksheets for floors, spaces, types, components, contacts and maintenance jobs. It was developed by US public agencies to improve handover to owner-operators.
You may also see the term “BIM Level 2”. It comes from the UK’s Bew-Richards BIM maturity model. Level 2 described collaborative working with discipline models and COBie for non-graphical data. As NBS notes, the international ISO 19650 series now defines the BIM process and has its roots in the UK’s PAS 1192 standards. Many teams now refer to the standard instead of a level.
BIM is not a single piece of software, but BIM tools do the modelling, checking and sharing. Common BIM applications include:
Point cloud and photogrammetry tools also feed scan-to-BIM work on existing buildings. For a fuller comparison, including IFC+SG support, see our guide to BIM software in Singapore.
Singapore uses BIM both as a productivity tool and as the basis of regulatory approval.
BCA describes Integrated Digital Delivery (IDD) as one of the key thrusts of the Built Environment Industry Transformation Map. It uses digital technologies to connect all stakeholders on a project across design, fabrication, construction and asset management. BIM is the information backbone of IDD, and BCA publishes resources on producing quality BIM models.
CORENET X is Singapore’s one-stop digital platform for regulatory approval of building works. Qualified Persons make coordinated submissions to seven agencies: BCA, URA, LTA, NEA, NParks, PUB and SCDF. Building works follow Pre-Submission Consultation, then the Design Gateway, the Piling Gateway (where applicable), the Construction Gateway and the Completion Gateway. Independent Submissions and a Direct Submission Process for smaller-scale works are also available. BIM models are submitted in IFC+SG format, which combines IFC with Singapore-specific data so agencies can read, review and check the model. Our explainer on what IFC+SG is covers the details.
Key dates, from the joint BCA and URA circular of 23 July 2026 (APPBCA-2026-12 / URA/PB/2026/08-DCG):
The CORENET X Code of Practice, now in its fourth edition (launched 22 September 2026), documents submission requirements across agencies. For a practical reading of the threshold, see CORENET X from 1 October 2026.
Results depend on how well BIM is implemented. These benefits are well established:
The main challenges in BIM implementation are cultural and procedural rather than technical: unclear information requirements, uneven skills across the supply chain, and models that are not maintained after design. The guides listed below go deeper on each of these topics.
Successful integration of BIM depends more on planning than on software. A practical sequence:
Beyond+ supports the transition to BIM through BIM services in Singapore, including Revit modelling, coordination, CORENET X submission support and scan to BIM, as well as corporate BIM training for in-house teams.
BIM stands for building information modelling (spelt “modeling” in US English). The same acronym is also used for the building information model, which is the digital output of the process.
No. BIM is a process for creating and managing information. Software such as Revit, Archicad or Tekla Structures is used to author the digital building model, and tools such as Navisworks are used to review them. Open formats such as IFC let these tools share information.
CAD produces drawings made of lines. BIM produces a model made of objects that carry data. Drawings, schedules and clash checks are then generated from the model, so they stay consistent when the design changes.
For regulatory submission, CORENET X Gateway Processes with IFC+SG models are mandatory for new projects with GFA of 5,000 m² or more from 1 October 2026. Smaller projects may stay on CORENET 2.0 or join CORENET X voluntarily. Contracts may impose their own BIM requirements on any project.
There is no single official list. Most projects follow briefing and design, coordination, regulatory submission, construction, and handover and operation, with information developed at an agreed level at each stage. ISO 19650 organises this as information requirements, delivery and exchange through a CDE.
No. ISO 19650 is written to be adapted to projects of any scale. Smaller projects often benefit most from a few targeted uses, such as coordination or accurate quantities.