What Is IFC-SG? Singapore’s openBIM Format for CORENET X Explained

What Is IFC-SG? Singapore’s openBIM Format for CORENET X Explained

12 min read

IFC+SG (also written IFC-SG) is the Singapore-specific way of structuring a BIM model in the openBIM IFC format so that regulatory agencies can read, review and check its data through CORENET X. It takes the international Industry Foundation Classes (IFC4) schema and adds Singapore Property Sets (SGPsets), properties and controlled values for local regulatory requirements. If your project submits through CORENET X, you will meet IFC+SG, and a model that looks right but exports wrong is one of the main reasons submissions stumble.

On this page
  1. What Is IFC-SG?
  2. Why IFC-SG Exists: CORENET X
  3. Who Maintains IFC+SG and Where the Official Resources Are
  4. What IFC-SG Requires from Your Model
  5. How to Export IFC+SG from Your BIM Authoring Tool
  6. How IFC+SG Models Are Checked Before Submission
  7. How IFC+SG Fits the CORENET X Gateways and the 5,000 sqm Mandate
  8. Common IFC-SG Problems We See
  9. Frequently Asked Questions
  10. References

Below: what IFC+SG is, where the official resources live, how to prepare models for CORENET X submission and export them from your authoring tool, and how it fits the CORENET X gateways and the 5,000 sqm mandate. New to the transition? Start with our CORENET X vs CORENET 2.0 comparison.

What Is IFC-SG?

IFC-SG (IFC+SG) is Singapore’s localisation of the Industry Foundation Classes, the vendor-neutral openBIM standard governed by buildingSMART International. IFC is an open, global standard also published as ISO 16739; buildingSMART stresses it is a data schema for organising objects, properties and relations, not just a file format.

The official CORENET X “What is IFC+SG” page describes IFC+SG as the definition of how BIM models are structured for CORENET X submission: IFC combined with Singapore-specific information, so agencies can read, review and check model data for regulatory compliance. It is built from four layers of information:

  • IFC4 entities – the standard IFC object types, such as IfcWall, IfcSlab, IfcDoor and IfcSpace.
  • SGPsets – Singapore Property Sets (for example SGPset_Wall, SGPset_Door, SGPset_Space) that carry the regulatory data required for CORENET X.
  • Properties and controlled values – the specific data fields agencies check, filled with accepted values rather than free text.
  • Checks – the checks applied to that data during CORENET X review.

How an IFC+SG model is structured

According to the IFC+SG Data Structure page, a spatial structure (IfcProject, IfcSite, IfcBuilding, IfcBuildingStorey, IfcSpace) organises the model, while property sets attached to IFC objects store the information: standard Psets such as Pset_WallCommon for common data, SGPsets for the Singapore-specific data CORENET X requires.

AspectStandard IFC (buildingSMART)IFC+SG (CORENET X)
PurposeVendor-neutral exchange of built asset informationRegulatory submission and review through CORENET X
Schema basisIFC versions such as IFC4 and IFC 4.3 (ISO 16739-1:2024)IFC4 entities, extended with Singapore data
Property setsStandard Psets (e.g. Pset_WallCommon)Standard Psets plus mandatory SGPsets (e.g. SGPset_Wall)
ValuesDefined by the project or softwareControlled values listed in the IFC+SG Excel Mapping File
Governing documentsbuildingSMART standardsCORENET X Code of Practice, Excel Mapping File and Glossary of Identified Components

Why IFC-SG Exists: CORENET X

Under CORENET 2.0, agencies reviewed 2D drawings and documents. CORENET X replaces that with coordinated BIM submissions reviewed on a multi-agency basis, so every consultant’s model must speak the same regulatory language. IFC+SG is that language: the CORENET X website lists “BIM Submission in (IFC+SG) format” as one of four key changes, alongside the new submission process, the Submission Portal and the Code of Practice.

When you submit through the CORENET X portal, each discipline’s model is exported to IFC+SG and routed through the submission gateways, where seven agencies review it: BCA, LTA, NEA, NParks, PUB, SCDF and URA.

Who Maintains IFC+SG and Where the Official Resources Are

IFC+SG resources are published by CORENET X, which the official site describes as “a co-creation effort between the public agencies and industry”. The joint BCA and URA circular of 23 July 2026, Updates to CORENET X Implementation Plan (APPBCA-2026-12 / URA/PB/2026/08-DCG), introduced an IFC+SG Knowledge Hub for implementation guidance. Its resources are consolidated at go.gov.sg/cx. The IFC+SG section of info.corenet.gov.sg is organised into the following resources:

Official resourceWhat it is for
IFC+SG Onboarding ChecklistA three-step path: build your knowledge base, prepare before modelling, then model and validate
IFC+SG Excel Mapping FileThe IFC entities, SGPsets, properties and controlled values required for submission (the version listed at the time of writing is dated 22 September 2026)
Glossary of Identified ComponentsDefinitions of the components agencies identify in the model, and how to interpret them
CORENET X Code of PracticeWhat is required at each submission stage; the Fourth Edition (2026-09) is listed as current
BIM Authoring Tools and Plug-In & 3rd Party ToolsSoftware-specific setup guidance, plus review and validation tools

The mapping file page recommends using the Code of Practice, Glossary and mapping file together: the Code of Practice says what each stage requires, the Glossary defines components, and the mapping file gives the IFC entity, subtype, property set, property name and required value. The file is versioned, so confirm you have the current one before each stage.

What IFC-SG Requires from Your Model

  • Correct element classification – objects mapped to the right IFC entities, not modelled-as-something-else workarounds. The official General Modelling Practices advise using standard predefined types where they fit and USERDEFINED only where IFC+SG subtype requirements call for it.
  • Regulatory attributes filled – the SGPset properties agencies check, populated in the model with controlled values rather than annotated on drawings.
  • Spaces and storeys defined properly – much of the regulatory review reads spatial data, not just geometry.
  • Correct coordinates – the Code of Practice requires federated models to be geo-referenced to SVY21 (EPSG: 3414) and the Singapore Height Datum, so discipline models line up when federated.
  • Unique GUIDs – no duplicate IFC GUIDs from copied templates or repeated blocks.
  • Validation before submission – checking the exported file against IFC+SG requirements before an agency does.

How to Export IFC+SG from Your BIM Authoring Tool

Mainstream BIM authoring tools export IFC; what the CORENET X workflow adds is the setup of IFC+SG parameters, property mappings and export settings. The official BIM Authoring Tools page lists Revit, Archicad, Tekla, OpenBuildings Designer, BricsCAD BIM, SketchUp and Rhinoceros 3D. Here is what it says for the most common tools.

Autodesk Revit

The CORENET X Revit page lists three required pieces: an up-to-date Revit, Autodesk’s Revit Interoperability Tools (needed for IFC+SG shared parameter and subtype workflows, installed before loading the setup files), and the latest IFC Exporter for Revit. The IFC+SG setup files then add the data fields and control the export:

  • Shared parameters – add the IFC+SG data fields to Revit (version-specific files).
  • Property set files – control which IFC+SG information exports to IFC.
  • IFC+SG subtype files – define the subtype values used for classification and checking.
  • Export setup – the standard “IFC-SG Regulatory Requirements View Setup” locks the property sets field, so the page advises duplicating it and selecting the latest property sets file. It also advises checking the coordinate base for every model.

The page also flags a Revit 2025/2026 issue where some elements in linked files may be missing from exports, with an IFC Repair Tool (go.gov.sg/repairifc) as the fix. Our Revit BIM modelling service builds these settings into the model from the start.

Graphisoft Archicad

The CORENET X Archicad page outlines four steps: set up element classification, map IFC+SG data to the required properties, export with the required IFC setup, and review the exported IFC. Templates, libraries and add-ons come from Graphisoft’s CORENET X and IFC+SG page.

Tekla Structures and other tools

The CORENET X Tekla page points to Trimble’s IFC+SG resource centre for Tekla Structures and Trimble Connect plugins and a model preparation guide. For SketchUp and Rhino, export is supported through the GingerBIM solution (beta), and teams are advised to verify the exported IFC against CORENET X requirements.

How IFC+SG Models Are Checked Before Submission

The Onboarding Checklist ends with “Model and Validate”: review exported models in IFC viewers for geometry, coordinates and completeness, then validate schema, model quality and selected regulatory requirements. The Plug-In & 3rd Party Tools page lists viewers such as BIMvision and BIMcollab Zoom, and third-party validators including the Bimeco Validator, the BuiltSearch IFC+SG Validator and a GUID checker; the Revit Interoperability Tools also include a Model Checker for parameter values before export.

Inside the Submission Portal, QPs can run a Pre-Submission Check with the Model Checker (MC); CORENET X support encourages at least one round before submitting to agencies. The MC is supplementary and, as CORENET X states, not intended to replace manual review. For the errors that most often fail validation and how to fix them, see our guide to common IFC-SG validation errors.

How IFC+SG Fits the CORENET X Gateways and the 5,000 sqm Mandate

Building works under CORENET X follow Pre-Submission Consultation, then the Design, Piling (where applicable), Construction and Completion Gateways; Independent Submissions and a Direct Submission Process also exist. Our guide to the CORENET X Code of Practice explains what each gateway needs. CORENET X also accepts non-BIM submissions alongside IFC+SG models.

Whether IFC+SG applies to your project depends on its size:

  • From 1 October 2025, the CORENET X Gateway Processes became mandatory for new projects of 30,000 sqm GFA and above.
  • From 1 October 2026, they are mandatory for new projects of 5,000 sqm GFA and above (BCA/URA circular, 23 July 2026).
  • IFC+SG format is mandatory for projects of 5,000 sqm GFA and above. Below that, URA states that 2D format or lightweight BIM are allowed, and these projects may continue in CORENET 2.0.
  • Projects of 5,000 sqm and above that commenced submissions in CORENET 2.0 by 30 September 2026 may continue there for now.

For the full detail on what counts as a “new project”, read what changes on 1 October 2026.

Common IFC-SG Problems We See

The pattern is consistent: the native model looks complete, but the IFC+SG export drops or mangles information – wrong entity mapping, unfilled SGPset properties, spaces that exist visually but not as data, misaligned federated models. Because validation happens at submission, these surface at the worst possible moment. The fix is upstream: model structure and export discipline built in from the start, plus BIM coordination before export. That is the readiness work our CORENET X e-submission support covers; our CORENET X submission checklist lists what to prepare before each gateway.

Frequently Asked Questions

Is IFC-SG the same as IFC?

IFC-SG is built on IFC. The geometry and core data model are standard IFC4. The +SG layer adds Singapore Property Sets (SGPsets), properties and controlled values for agency review.

Do I need special software for IFC-SG?

No. Mainstream BIM authoring tools export IFC. What you need is the correct IFC+SG setup for your tool (for Revit, the shared parameter, property set and subtype files plus the Revit Interoperability Tools) and a model structured so the export carries the required information.

Who is responsible for the IFC-SG export?

Each discipline exports its own model, but the Qualified Person submits the coordinated package. Submission readiness is therefore a team discipline, not a last-step file conversion.

Where do I download the IFC+SG mapping file?

From the IFC+SG Excel Mapping File page on info.corenet.gov.sg. Check the version before each stage.

Does my project need IFC+SG if it is below 5,000 sqm?

Not under the current rules. Projects below 5,000 sqm GFA are not required to onboard the Gateway Processes and may continue in CORENET 2.0, where 2D or lightweight BIM is allowed. They may still choose to submit through CORENET X voluntarily.

Where can my team learn IFC+SG?

The July 2026 circular points to training courses on the IFC+SG format and the CORENET X Training Environment for practice submissions. Beyond+ also runs corporate BIM training for project teams.

Preparing a CORENET X submission and unsure your model will validate? Beyond+ reviews model readiness and IFC+SG structure before the gateway does. Explore our BIM services or talk to us.

References

  1. What is IFC+SG. CORENET X (Government of Singapore). https://info.corenet.gov.sg/ifc-sg/start-here/WhatIsIFCSG
  2. IFC+SG Onboarding Checklist. CORENET X. https://info.corenet.gov.sg/ifc-sg/start-here/ifcsg-onboarding-checklist
  3. IFC+SG Data Structure. CORENET X. https://info.corenet.gov.sg/ifc-sg/requirements—submission/ifcsg-data-structure
  4. IFC+SG Excel Mapping File (file version 22 September 2026). CORENET X. https://info.corenet.gov.sg/ifc-sg/requirements—submission/ifc-sg-excel-mapping-file
  5. Glossary of Identified Components. CORENET X. https://info.corenet.gov.sg/ifc-sg/glossary-of-identified-components
  6. General Modelling Practices. CORENET X. https://info.corenet.gov.sg/ifc-sg/modelling—authoring/GeneralModellingPractices
  7. BIM Authoring Tools. CORENET X. https://info.corenet.gov.sg/ifc-sg/modelling—authoring/bim-authoring-tools
  8. Revit – IFC+SG setup and export. CORENET X. https://info.corenet.gov.sg/ifc-sg/modelling—authoring/bim-authoring-tools/revit
  9. Archicad – IFC+SG workflow. CORENET X. https://info.corenet.gov.sg/ifc-sg/modelling—authoring/bim-authoring-tools/archicad
  10. Tekla – IFC+SG workflow. CORENET X. https://info.corenet.gov.sg/ifc-sg/modelling—authoring/bim-authoring-tools/tekla
  11. Plug-In & 3rd Party Tools. CORENET X. https://info.corenet.gov.sg/ifc-sg/modelling—authoring/3rdpartytools
  12. CORENET X Code of Practice (Fourth Edition, 2026-09). CORENET X. https://info.corenet.gov.sg/regulatory-process/corenet-x-code-of-practice
  13. CORENET X home page. CORENET X. https://info.corenet.gov.sg/
  14. Updates to CORENET X Implementation Plan (APPBCA-2026-12 / URA/PB/2026/08-DCG). BCA and URA, 23 July 2026. https://www.ura.gov.sg/guidelines/circulars/dc26-08/
  15. Plan Lodgment Application. Urban Redevelopment Authority. https://www.ura.gov.sg/guidelines/development-control/planning-permission/plan-lodgment-application/
  16. Can QPs use the MC to check their BIM models before submitting via CORENET X? CORENET X Support. https://support.corenet.gov.sg/hc/en-us/articles/13750763534095-Can-QPs-use-the-MC-to-check-their-BIM-models-before-submitting-via-CORENET-X
  17. Is it necessary for QPs to review the design after the BIM models are checked by MC MVP? CORENET X Support. https://support.corenet.gov.sg/hc/en-us/articles/16336534594191-Is-it-necessary-for-QPs-to-review-the-design-after-the-BIM-models-are-checked-by-MC-MVP
  18. Industry Foundation Classes (IFC). buildingSMART International, updated 17 April 2026. https://www.buildingsmart.org/standards/bsi-standards/industry-foundation-classes/
  19. CORENET X and IFC+SG. Graphisoft. https://www.graphisoft.com/en-sg/corenet-x-and-ifc-sg/
  20. IFC+SG resource centre. Trimble / Tekla. https://support.tekla.com/corenet-x-ifc-sg