Portfolio
CCSM MEP BIM Coordination Model
Multi-discipline mechanical, electrical, and plumbing BIM coordination for underground civil infrastructure
Beyond+
Project Details
Project Reference
CCSM — Combined Civil & Services Model
Client / Owner
Land Transport Authority (LTA), Singapore
Project Type
Underground Civil Infrastructure
Main Contractor
Confidential
BIM Discipline
MEP (Mechanical · Electrical · Plumbing)
Model LOD
LOD 300 / LOD 350
Software Used
Autodesk Revit · Navisworks Manage
Clash Detection
Yes — multi-discipline federated model
Project Status
Completed

Fig. 1
Scope Of Work


Key Deliverables
Federated BIM model (Revit + Navisworks NWD/NWF) — all disciplines combined
Clash detection reports (Navisworks) with resolved issue log
Coordinated MEP layout drawings — floor plans by level and discipline
Equipment room BIM models with clearance zones
Services sections and clash-free elevation views
Tunnel interface BIM coordination drawings
BIM Execution Plan (BEP) compliance documentation
As-coordinated model handover for site construction use
Why This Matters
Clash-Free Model
All inter-discipline clashes resolved before construction, reducing costly RFIs on site.
Multi Discipline
Mechanical, Electrical, Plumbing, and Fire Protection modelled and coordinated in one federated model.


Construction Ready
Coordinated drawings and model handed over ready for contractor use — reducing design-related delays.
Singapore Compliant
Delivered in accordance with LTA BIM standards, GreenMark requirements, and SS CP83 guidelines.
Tools & Standards
BIM Authoring
Autodesk Revit (MEP Workset)
Clash Detection
Autodesk Navisworks Manage
Model Coordination
Navisworks NWD Federated Model
File Exchange
IFC 2×3 / IFC 4 (open BIM)
Standards
LTA BIM Standards, BCA BIM Roadmap, SS CP83
Documentation
Microsoft Excel (clash logs), PDF reports
Legal Notice & Confidendiality Statement
This portfolio page is published for marketing and capability demonstration purposes only. All images, model views, and technical descriptions are used with the knowledge of the project owner and do not disclose any proprietary, confidential, or For-Construction (IFC) design information. The identity of the Main Contractor has been withheld in accordance with contractual confidentiality obligations. Published content complies with Singapore’s Copyright Act 2021, the Personal Data Protection Act (PDPA), and applicable non-disclosure provisions. No contract values, tender prices, or commercially sensitive data are disclosed. Beyond+ Pte Ltd retains all intellectual property rights over BIM deliverables produced.
Have a similar MEP BIM coordination requirement?
Contact Beyond+ Pte Ltd — Singapore’s trusted BIM specialist for civil & transport infrastructure.
